Peter Fend ARABIAN GULF INTEGRATION ROOM

From Peter Fend: "To those interested in the Basin of the Gulf installation at the Sharjah Biennial, in the Expo Center: here is a plan of the installation, with items numbered, and a price list for realization of the items on site. The prices are based, for larger site projects, on satellite investigations into similar-scale constructions, and, for smaller site projects, on prior budgets which I had prepared. Inquiries are welcome on all modeled and budgeted projects. Contracts are welcome, too. I am ready to discuss these estimate prices and project schedules with engineering and regional-planning firms in the area. The large figures are based on consultations with engineers during the years of satellite monitoring of similar-scale projects in the Arabian Gulf Basin and elsewhere. The small figures given are based on earlier project budgets."
pffend[at]yahoo[dot]de
ARABIAN GULF INTEGRATION ROOM AGIR Meaning, in French, “to act”.
Displaying how to make a cohesive whole of the Arabian Gulf as a basin. DRAFT PRICE LIST
1. Convex-Disc Ramp Stepdown, near Birecik, Turkey $300 MILLION
2. Wadi el Batin Cut-Through $800 MILLION (using aircraft)
3. Karun River Zig-Zags $1 BILLION (undershot waterwheels)
4. Nafuds cut with Multi-channel canals $300 MILLION
5. Sea-level Flushing, into UAE, or even to the Umm as Samim $1 BILLION
6. Offshore Biomass Rig: Gracilaria $100,000
7. Satellite assessment of marine bioproductivity using SeaWiFS data, through Global Feed $20,000
8. Cones, Cages and Wallows near Salt Pans (Sabkhas) $150,000
9. Flushing out Alluvial Fans at the Head of the Gulf Based on satellite assessment of Iraqi projects $2 BILLION
10. Convex-Disc Marsh Zig-Zag Strcture, for mountains $300,000
11. Wadi Yudayyah Hydrometric Area, site for projects Example: clearing the mouth to yield seagrass $20,000/month
12. Feather-Production Sequence, from urban wastes Example: keratin dispersion in swamps or oases $10,000/month
Dispersed throughout space. Undershot Waterwheels, to replace hydroelectric dams $20,000 per test
Inshore Biomass Rig: Microalgae $20,000
Labels: Peter Fend, Sharjah Biennial 8, United Arab Emirates


0 Comments:
Post a Comment
<< Home